Saturday 7 February 2009

The Windows have been delivered

Another weekend means another day-time trip to the construction site. It snowed friday, but it has all thawed away by now. It's still fairly wet though, so Beatrice and Bastian used the opportunity to play around in the mud in the so-called garden, while mom and dad was busy examining the construction... But not too busy to capture this piece of evidence.

As if we needed more than the thick layer of mud on them afterwards, especially Bastian. He was so muddy we had to take his jacket off before he could sit in his kids seat in the car, and had it not been quite cold we would have taken his trousers as well.

While the kids played around, we saw that most, if not all of the windows had been delivered. Here you can see some of the custom made windows; the triangular ones for the upper windows in the living room, and behind them, the round one to be fitted in the now square hole between the kitchen and the living room (seen in the middle of the last picture here).

The rest of the windows and doors are standard items, although they are supposedly very energy efficient, with tree panes of glass, with argon gas instead of plain old air in the space between the panes.


We have a lot of glass surfaces (especially in the living room where I suppose these window doors will be fitted) so it was important for us to have good windows that does not radiate all of the heat out of the house during the winter.